Life happened, and more than a year has passed.
New house, new baby, new year. And hopefully, new content here!
We left off with a half done guest bathroom, so let’s pick up there.
The chevron marble tile was drool worthy. So much so, that part of me regretted not using it in our master bathroom.
Here is a closeup, mid install:
We used simple 3×6″ white subway tile from Home Depot on the shower walls.
You can see that the front half of the floor still needs to be grouted – what a difference that makes. It really pops with the grout.
We went with an inexpensive 72″ double from Houzz. Simple sconces from Restoration Hardware, and mirrors from pottery barn kids (great source for less expensive mirrors!).
The wallpaper I lusted after turned out to be too lust-worthy ($2000 in materials alone), and so we held off. One day I will muster the energy to find another option I love.
Here is the final mood board:
And here is the current space!
We love “our” bathroom!!!!🙂
LikeLike